Lot 105 Stock Road, Lakelands Stage 2

Project: The Gardens Stage 2Client: Urban Capital GroupProject Duration: In progressConsulting Engineer: JDSI Consulting Engineers Description Italia Stone Group was awarded the construction of stage 2 civil works for Lot 105 in January of 2021. The Gardens Lake lands has been designed with a focus on creating vacant lots that integrate with the indigenous flora … Read more

ARC Infrastructure Eastern Goldfields Railway Rock Buttressing Stabilisation Works Phase 2

Project: Eastern Goldfields Railway Rock Buttressing Stabilisation Works Phase 2Client: ARC InfrastructureProject Duration: In progressConsulting Engineer: Advisian WorleyParsons Group Description Italia Stone Group was awarded the contract for supply and installation of 75mm granite rock fill and supply and installation of Sub-ballast capping. Italia produced 6000 tonnes of 75mm granite rock fill in their Northam … Read more

Shark Bay Salt – Production Capacity Increase, Phase 1

Project: Shark Bay Salt – Production Capacity Increase, Phase 1Client: Shark Bay Resources Description Conversion of an existing informal wastewater brine discharge channel to an engineered sump and pump out pond allowing client to collect and pump waste brine form its harvesting ponds back to the first stage concentration ponds, increasing production and avoiding brine … Read more

Ocean Reef Marina Breakwaters

Project: Ocean Reef Marina BreakwatersClient: Western Australian Land Authority (DevelopmentWA)Amour rock supplied and placed: 300 000 TonnesCore supplied and placed: 600 000 TonnesProject Duration: February 2021 to Excepted completion Oct 2022Consulting Engineer: MP Rogers & Associates pl Description Ocean Reef Marina Breakwater Project is currently in the construction phase. The project is being delivered by … Read more