Project: The Gardens Stage 2
Client: Urban Capital Group
Project Duration: In progress
Consulting Engineer: JDSI Consulting Engineers

Description

Italia Stone Group was awarded the construction of stage 2 civil works for Lot 105 in January of 2021. The Gardens Lake lands has been designed with a focus on creating vacant lots that integrate with the indigenous flora and fauna on site. The site is located between the Indian Ocean and the Kwinana Freeway. Italia commenced civil construction works in early January 2021 work are scheduled to be completed at the end of 2021.

The main scope of works included:

  • Bulk earth
    • Clearing and grubbing
    • Cut to, fill of 250 000 cubic metres of soil
  • 0.8 Km of retaining walls constructed by Italia’s retaining wall division
  • Sewer works
    • DN150 to DN300 installed
  • Construction of roads
  • Installation of stormwater and drainage
  • DN150 to DN600 Storm Water drainage installed
  • Installation of Potable water pressure mains
  • Installation of electrical network
  • Installation of NBN